FEA Commons Redevelopment Project

PHASE 1

GOAL: $375,000

Phase #1 Chart

$225,000
Storage Facility Construction

$100,000
Surveys, Planning & Architectural Services

$50,000
Old Print Shop Demolition

Estimated cost at time of publication.

COMPONENTS:

1. Entire Campus Survey (complete)
2. Conceptual/Architectural Planning
3. Storage Facility Completion
4. Old Print Shop Demolition

OUR GOAL IS TO HAVE PHASE 1 COMPLETED BY THE END OF 2025!
Storage Facility - Phase #1

Phase 1 is well underway!

A survey of our entire campus has been completed, and preliminary conceptual plans have been developed. The architectural plans for a new storage facility are complete.

Presently FEA Ministries uses the “Old Print Shop” as storage space for evangelistic books developed by our department of literature production and distribution, Gospel Publishing Mission, and other supplies. These evangelistic materials are handed out at large venues such as the Olympics, World Cup, and Biker events.

The planned 1800-square-foot storage facility will be located on an empty lot on the west side of Gomez Avenue. Once the Old Print Shop is emptied, this unsightly and dangerous building will be demolished, clearing the lot for the new FEA Headquarters building to be built during Phase 3 of this project!

PHASE 2

GOAL: $650,000

Phase #2

$400,000
Parking Lot Redesign

$175,000
Porch Redesigns

$50,000
Three Building Demolitions

$25,000
Continued Architectural Work

COMPONENTS:

1. Continued Architectural Planning
2. Demolition of Buildings (Post Office, Cottage, Presidential Library)
3. Porch Redesigns on Schmul Center and Glen Reiff World Education Center
4. Parking Lot Redesign – to include over 72 parking spots with improved traffic flow

OUR GOAL IS TO HAVE PHASE 2 COMPLETED BY THE END OF 2026!

Covered entrance to Schmul Center

Covered entrance to Schmul Center

New Parking Lot and Traffic Flow

New Parking Lot and Traffic Flow

Phase 2 will focus on the completion of the new parking area and improved traffic flow.

This will require the removal of three buildings, including the Post Office, the Presidential Library and a cottage.

New porches will be added to the front of the Schmul Center (dining hall) and the Glen Reiff  World Education Center.

Both these buildings face the Commons area, and new porches will significantly improve the appearance of this central area of our campus.

PHASE 3

GOAL: $2.2 Million

COMPONENTS:

Construction of New FEA Ministries Headquarters

This estimate is based on a construction cost of $250 per/square foot.

OUR GOAL IS TO HAVE PHASE 3 COMPLETED BY THE END OF 2028!

Phase #3 -  FEA Headquarters

New FEA Ministries Headquarters

Phase 3 will consist of the construction of the new FEA Headquarters building.
Once completed, this building will house the combined offices of Sea Breeze Community, Sea Breeze Camp, and Hope International Missions.

It will also provide an attractive “front door” to our campus.